Tub-to-Shower Conversion | Natick, MA
Sep 9
1 min read
Updated: Sep 29
The goal of this Natick project was not a full bathroom remodel, but a practical conversion of the existing tub area into a more accessible walk-in shower. The existing tub was removed and the shower floor was rebuilt with a low threshold, new drainage and a pebble-tile finish.
It shows that Bright Valley can solve a specific homeowner need without turning every project into a full gut renovation.




