Second-Floor Bathroom Renovation | Quincy, MA
Sep 10
1 min read
Updated: Sep 29
This second-floor bathroom was taken down to the framing and rebuilt with a completely updated layout and finish. The project included demolition, wall and shower preparation, new tile work, updated fixtures and finish details throughout the room.
The finished bathroom replaces the dated tub surround and finishes with a cleaner, more modern space while keeping the room practical for everyday use.




